Jump to content

Leaderboard


Popular Content

Showing content with the highest reputation on 06/07/2019 in Posts

  1. 1 point
    A great thread and wonderful workmanship . Ignition - unless I’ve missed it, there’s no mention of the condenser, has it been changed? Judging from the number of faulty / weak condensers that I change on not quite so old engines, it may be worth a punt.
  2. 1 point
    Well done Richard. It'll soon be purring like a kitten. As near as a two stroke sounds to a kitten anyway.
  3. 1 point
    Stormin

    Bitter and twisted.

    Finally got it finished today. It's probably take something like 5hrs total. Worst bit was the patch in the first photo'. With a straightedge across you could see daylight. The second photo' is how it looks now. I decided to temporary fit the head just to keep things together, till I get the parts I need. That is when I found another PO's bodge. One of the head bolt holes by the exhaust valve, has been tapped out the 3/8th UNC. Plus the bolt used is slightly longer with a longer shank. Not much I can do about the hole, but the bolt I will cut down to the length of the others and run a die down the shank, to get the same amount of thread. I get any parts from Meetens, Preston, Lancs. I've found them very good and help full.
×
×
  • Create New...