Now to join the two bit of the drop link together..
The fixed length one was easy.. A bit of Wheel Horse lift arm with some more steel pipe hammer inside for extra strength.
The adjustable drop link needed a bit more thinking about..
As I couldn't find a bolt I thought was not only strong enough, but I also had a nut to fit, I made my own.. The thread is only partly cut here..
My first attempt came out a bit wonky and the threaded bit decided it didn't want to wind in or out!
Attempt 2 ended up with a wonky thread being cut!!
Attempt number 3 involved cutting a thread off a toll I haven't used in at least 8 years!! But it worked..
Two drop links tack welded together.. I know that having to removed a pin to adjust the adjustable drop link isn't ideal, but it will do for now and keeps this 3 point build within budget... which is nowt.. Yep only built with what I had kicking about the shack
Ok, I may of borrowed the 3 point arms from the 6x6m but were gloss over that
And fitted..
All I need to do now is to pull it all apart for final welding and strengthening..
The plan was to make a start on that today, but it seemed a shame to be inside with the nice sunny weather, so Pete and I went for a drive