Jump to content

Leaderboard


Popular Content

Showing content with the highest reputation on 11/03/2017 in Posts

  1. 2 points
    HI Doug, I've had another thought on the clamp thingys.. Rather than take metal off of one side to balance the UJ's, it would be better and stronger to add metal to one side and build it up with weld (making sure not to let things get too hot) until both sides match.. While waiting for the bearings to turn up, I thought I'd make a start on a sleeve to fit over the input shaft on the TB.. Not the best photo (I will get a better one) but here's the shaft in question. The only bit of steel bar I have which is long enough is made from very hard steel and looks like it has been used to hold a JCB bucket on... That sort of hardness! Anyway, I can make it in two parts and weld them together which would make it easier turning the tapered part half way down the shaft inside.. These two lumps I made years ago as pivot points for a dozer blade that was going to go on the 6x6.. A lot of turning to get them down to size! At least one is mostly done Woo Hoo... The bearings arrived Here's the TB to front end bearing mocked in place.. Best start getting the bearings mounted then.. First up something to bolt them to.. Well, a couple of somethings.. Bolted on. The black bit of steel across the lower bearing bolts is just to keep the bearing square to each other. You can just see where I welded on some tempoary bracing to the drive shaft to stop anything moving about withough the axle stand and other bits that were holding the bearings etc in place. If you flip the bearings over you can see the captive nuts that have been welded on... Don't think they are going anywhere Now the fun bit.. Making four somethings to bridge the gap between the back of the bearings and the chassis/frame.. Starting with a bit of CAD (cardboard aided design) work.. Which goes somewhere here.. Rather hard to hold it in place and take a farto at the same time! Roughly cut out of steel.. That looks better. Four of em made and tacked in place.. Bearings off.. Fully welded up... Almost.. It will be easier to weld the extreme top on bottoms where the brackets fit on the frame without the engine in and sump guard in place, so that can wait until stripdown time. Welds ground down, a nice curve at the back to clear the engine. And most importantly, there is still plenty of UJ clearance here.. And here And to finish off this update, a photo of the bearings etc quickly bolted on for this very photo.. The mounts were still very hot from welding and grinding so I didn't want the bearings sitting getting hot for too long..
  2. 1 point
  3. 1 point
×
×
  • Create New...