Thanks Alan, Been preoccupied with lots of small jobs and pulling together two of the three sections of this project.
The middle section (reduction gear unit) has taken a lot of time and work, as it includes the fuel tanks. They are finished, lacquered, mounted and the fuel gauge nestles between them-
Still incomplete middle section where I have to make up the cable and lever system for operating the clutch/brake shoes. The last job will be to fill the Reduction gear unit with oil -
All the brass/bronze work has been polished and lacquered as assembly progressed, with the exception of the engine cowling, as I now have some clear gloss VHT Lacquer for that.
output/fan drive sprocket modified to fit onto a woodruf key and locked in place with a grub screw
Finalised the location of the modified throttle lever and cable route, which keeps it neat, tidy and handy location. Lever and cable joints are watertight.
Although I will have to change the Carb Air inlet and Choke layout to prevent water ingress-
Tempted to start the engine for a run soon to check how it sounds with the exhaust. Has a lovely bright blue spark at the plug and the timing is spot on.
Mahogany planks being treated prior to fitting and will be yacht varnished after. Pump drive and location of it is a bit of a headache, but working on it-
Regards.