Jump to content

Leaderboard


Popular Content

Showing content with the highest reputation on 12/20/2018 in all areas

  1. 1 point
    Stormin

    C-125 Rebuild.

    Managed to get quite a bit done today. One or two hiccups, but a good day. Got the engine painted this morning and the paint dried quite quickly. By lunch time it was back in place. Next I fitted the drive belt and this was when I hit problem number one. As you can see in the photo', the bottom run is under the brake pedal. Should be over the top. So foot plate had to be loosened, the pedal moved out and the operating rod disconnected from the pedal. Got that correct and moved on to the P.T.O. This provided a little snag, as the support bar would not connect to the pulley spindle. Cured that by taking everything off again and moving the drive pulley further in. It wasn't quite fully on by about 1/16". Just enough to prevent support bar connecting with the shaft. All OK now. Fuel pump is now refitted along with governor linkage. Finally I thought it a good idea to fill the engine with oil, which I duly did. After which I did a bit of tidying up before returning to the tractor. Then I SAW IT. A big puddle of oil under the tractor. The C-125 has a tube attached to where the drain plug would be. I'd forgotten to fit it.
  2. 1 point
    Stormin

    C-125 Rebuild.

    Checked the bore today and it is within spec. So after a deglaze, the new piston, rings and rod got fitted. The engine is now complete but before I refit it, it'll get painted. There are still some bits and bobs to paint and the bonnet to finish, but the weather is too wet and damp for any more painting.
×
×
  • Create New...