The Showman kindly made up three ploughing sighting poles for me, which he brought up to Newby. I've been thinking of how to transport them when at a match. Today I set too to see what I could come up with.
Some aluminium 1" angle, U bolt, plastic pipe and a couple of pieces of cushion foam and two hours later the result.
Yesterday I made up some points for them. Held in place with split dowels. Didn't want to damage Chris's paint work.
The poles rest on a rubber strip and another piece of foam goes 'tween poles and U bolt, to stop them rattling about.
BTW. I can still operate the clutch. .