Thanks Nigel. Next time I need to drill any very big holes through thick steel I will give you a bell
Well chaps, it's looking like this 3 point saga is finally coming to the end.. Not much left to do now
Yesterday I finished welding up the lower arm mounts, and then turned my attention to the roll bar. Lot's of seam welding and plating over a few holes to make things stronger..
Here's the first two plates on top of the diagonal bit's ready to be welded on..
I had four round "open" bit's to make filler plates for..
I was going to cut some circular plates out until I spotted quite a few of these big thick washers (thank you Michael )..
Just the right size, but how would I hold them in position for welding?
By welding some off cuts into the washer holes I created my own mini metal mushroom garden
Which gave me a way of holding the washers in place for welding..
Tacked in
With the welding all done the last job for yesterday was to get the bare metal painted to stop it rusting. If I had some black paint then I would of painted the roll bar with some.. But a bit of colour adds character.. It will soon get dirty and start to blend with with the rest of the GT anyway
The lower mounts could do with a second coat..
Today's plan is to get the GT all bolted back together then enjoy not cutting, grinding, welding and filing thick steel for a short while