Jump to content

Stormin

Member at rest
  • Content Count

    6,669
  • Joined

  • Last visited

  • Days Won

    395
Posts posted by Stormin
 
 

  1.   With one thing and another and recently moving to a new property, nothing got done with the Gardenmaster.

     Today I went over the border to Duncs and the Gardenmaster came home with me, for me to see if I can get it sorted. No spark for starters.

     The afore mentioned photo copies that Paul sent Dunc, I forgot. I'll see if he can find them when over there next week.

     What I want to know for now. On a quick look I can't see any on/off switch or kill switch. If there is one. I'm assuming to stop the engine you just pull the throttle lever to the choke position?

     

     


  2.    Your engine definitely is not for a bike. As for being rare, I would say certainly. I have never seen one before. It's up to you as to painting. Either way painted or not, it's worth retaining for it's rarity.

     

      You could enquire at Meetens, Preston about spares. They do spares for all kinds of engines and may be able to help. Google for contact info.

     


  3.   Had a walk down the bridleway this afternoon and came across the little buck lying dead on one side. He is unmarked and I can only assume he choked as he ran off seeing my neighbour. :(

     I'll bury him tomorrow before any scavengers find him.


  4.  Bit of a catch up. Since the last post, the workshop at the other property has been emptied along with house etc.

     

     Back to Dunc's on last Wednesday. Mezzanine floor to erect. Also some shelving to assemble.

    Timber for Mezzanine floor being delivered Thursday morning. So shelving was seen too.

     

     Thursday morning arrived but no timber. We did get the remainder of the racking assembled while waiting for the timber. Most is in position. Timber arrived just after lunch.

    P1030502.JPG.b40869ef54dc28719f70956d699468e5.JPG

     

     Centre up right in place with box beam installed. After fitting stronger timber along opposite sides to support the floor trusses, the first floor truss was fitted in place. Only another 19 to go. Dunc did make an error when ordering trusses and brackets. Only ordered 20 brackets instead of the 40 we'll need. Hopefully get more brackets tomorrow and get all trusses in place.

     

    P1030501.JPG.5a2882724108001b29c8a61b1f7cbe9a.JPG

     

    The area in the photo' above will be an internal workshop.

     

    Friday.

    Did well to day with the mezzanine floor.

    The shortage of brackets, was solved by fitting the floor trusses on the other side, on top of the support beams.

    P1030504.JPG.e501b7a9949cf44c457c7ea573595288.JPG

     

     Doing this had an advantage as it raises the floor, just enough to clear the digger roof if it ever needed to be worked on there.

     

    All brackets and trusses secured over the internal workshop.

    P1030505.JPG.c5003b8ceb86698bc1f70029cb6630f6.JPG

     

     All trusses now in place except for the missing one front left. That will have to be fixed inside the uprights with brackets.

    P1030507.JPG.3cfc95abd94c340d18391b8dcb6a7fb6.JPG

     

     End of play for now. Floor boards to be ordered. They'd be fitted later sometime next week. Electricians starting Monday.

    P1030506.JPG.f080fa554234885778ff9d7c23292222.JPG

 
×
×
  • Create New...