Managed to get a bit of workshop time today and got some bit jobs done on the Black Horse.
(1) Clutch pedal rod adjuster nut freed off. Pedal doesn't need pressing as far forward now.
(2) Slight play in right rear hub taken out. About 6 thou difference in hub bore and drive shaft diam. Sorted by use of hammer and centre punch to inside of hub. Crude but effective. Nice and tight now.
(3) New gaiter fitted to bottom of gear lever.
(4) Stop made and fitted to prevent brake pedal from coming to far back.
(5) Is on going. Cleaning up a pair of scooter split rim wheels I got at Newby Hall. These are just right for fitting to the front with tri ribs on. Goodness knows what they've been painted with, but it's like concrete.
Ready to paint now, after some filler is applied to the rather corroded insides.
(6) Started to clean up the front tachomatic.
BTW. The little tool box, along with a second, is an MF item.