A bit more progress made on the workshop.
8 double sockets wired and working, same on opposite walls.
2 x 5ft double fluorescent lights with 2 10w LED flood lights for over the work-bench.
Got about half of the insulation board up so far.
To do list - finish ceiling, paint walls white, paint bottom of wall dark grey, paint floor, build work-bench and install some type of heating, then sit down and have a rest !
Noel.